Data Centers & Mission Critical
DCIM, cooling control, and PUE-reducing systems engineered for environments where downtime is not an option.
DCIM, cooling control, and PUE-reducing systems engineered for environments where downtime is not an option.
Data centers and mission-critical facilities are evaluated on two numbers: uptime and power usage effectiveness (PUE). EES delivers control systems that protect the first while improving the second. Our data center infrastructure management (DCIM) and chilled water plant control work helps operators reduce energy spend without compromising the reliability that the workloads inside the facility depend on.
We have been delivering critical-environment controls since the era when these were called computer rooms — and we have evolved with the industry through every generation of cooling technology, density profile, and resilience standard.
DCIM platforms that aggregate visibility across power, cooling, environmental, and asset systems. Real-time dashboards for operations, historical analytics for capacity planning, and the alarm management that keeps small issues from becoming incidents.
Plant-level optimization of chillers, pumps, cooling towers, and chilled water distribution. Sequencing strategies that match capacity to load while minimizing energy consumption. Integration with thermal storage and free cooling where applicable.
Targeted PUE improvement programs combining instrumentation, control logic refinement, and operational changes. Real, measured savings — not modeled estimates.
Redundant control architectures, failover sequencing, and the validation that proves resilience claims. Coordinated with UPS, generator, and switchgear systems to deliver verified facility-level reliability.
Distributed environmental monitoring across white space, electrical rooms, and mechanical spaces. Rack-level and aisle-level visibility integrated with the broader facility control system.
Every point of PUE improvement on a multi-megawatt data center translates into seven-figure annual savings. Our DCIM and chilled water plant work has helped clients capture those savings without changing their resilience profile.
Data center projects move fast and require partners who can keep pace. Reach out and we will get you in front of engineers who understand the constraints.